Knoydart case study

The project

The Knoydart community is isolated from the national grid and supplies all of its energy locally from a hydro-electric power scheme backed up by a diesel generator. The community currently experiences black-outs when demand exceeds grid supply and at times of peak demand they must divide their supply in half, receiving 50% of their power from the hydro scheme and 50% from a diesel generator. The hydro turbine runs under-capacity during off-peak hours and the diesel generator is used during maintenance of the turbine every two weeks. Fuel for the back-up diesel generator and for land and sea vehicles has to be transported from the mainland via sea routes. This is undesirable due to high costs and increased carbon emissions.

Problems in Knoydart

1. Regular black outs and power disruptions due to hydro system failures and periodic maintenance

2. Energy demand pattern is not compatible with the hydro generation

3. High levelised cost of energy due to use of a large diesel generator

Frequent Power Transmission System Breakdowns

Environmental Pollution – Dirty Diesel!

Hydro Generation System Break downs

High cost of repairs

Road Map to Solve Problems and the Storflow Battery

Funded by the Local Energy Challenge Fund, a comprehensive feasibility study was carried with Knoydart Renewables to develop a suitable energy storage solution for the community. The StorFlow battery and control solution was designed to store hydro-generated energy and provide back-up power when required. Subsequently, Knoydart Renewables ordered a small-scale battery which was installed in April 2017. The 8kW/30kWh flow battery was designed, built and installed in a purpose built enclosure to stabilise the power supply to the main office building of Knoydart Renewables.

The installed Flow battery is used to;

1. Store hydro generated electric energy during off-peak hours

2. Sense frequency variations and inject power into the grid to stabilise the Knoydart grid (Frequency response)

3. Time shift hydro-generated power

4. Work as a power back up system during a grid failure

5. Automatically collect data for future system improvements

Available Excess Energy Capacity for electrical storage in Knoydart

The StorFlow battery installed in Knoydart

Results to date

1. The StorFlow battery helped to keep the diesel generator shut-off at night during the Knoydart hydro pipe failure in April 2017 and during 3 other consecutive grid failure events in 2017.

2. The flow battery powers the system at night during normal operations avoiding use of the diesel generator

3. Recorded a coulombic efficiency of 93%

4. More than 820kWh exported in October 2017

5. Successful frequency response/stabilisation and backup functionality.

StorFlow battery monitoring system which shows 93.15% Efficiency